Manpower
Project Manager
Available : 2
Planning engineer/ QA-QC engineer
Available : 4
Safety officer
Available : 3
Surveyor (with equipment)
Available : 2
NDT engineer
Available : 1
Discipline Engineers (Civil/ Mech/ Elec)
Available : 6
Foreman / Supervisor
Available : 10
Store keeper / store in-charge
Available : 4
Welder (Downhill)
Available : 4
Welder (Dolly Mix)
Available : 6
Welder (Piping & Structural)
Available : 6
Fitter
Available : 4
Grinder
Available : 10
Machine operator
Available : 4
Blast cleaning crew
Available : 2
Electrician / Machine
Available : 3
Rigger
Available : 24
Drivers
Available : 12
Pipe bending Crew
Available : 1
Thrust/ Hor. Auger Boring crew
Available : 2
X-ray / Gamma Ray crew
Available : 2
Hydro-testing crew
Available : 1
Field joint coating crew
Available : 3
Unskilled workers
Available : As required
Additional resources can be mobilized as required.
Equipment
Welding Rectifier
Quantity : 21
Own
D.G. Sets : 62.5 KVA
Quantity : 5
Own
Pipe Clamp – External 4” /8” /12” / 24”
Quantity : 3 each
Own
HDD Rig with All Equipment & Accessories up to 120 Ton
Quantity : As required
Associate
X-Ray M/C – External / Internal
Quantity : As required
Associate
Gamma Source
Quantity : As required
Associate
Air Compressor – (300CFM or above)
Quantity : 3
Own
Air Compressor – (600 CFM or above)
Quantity : 1
Own
Blast Cleaning Machine
Quantity : 4
Own
Hydra (12 MT)
Quantity : 2
Own
Excavator - Ex 140
Quantity : As required
Own / Associate
Excavator - Ex 200
Quantity : As required
Own / Associate
Pipe Bending Machine (up to 12”)
Quantity : 1
Own
Water Lifting Pump (Adequate Capacity)
Quantity : 4
Own
Filling Pumps (120 M3/ Hrs)
Quantity : 1
Own
Pressurization Pump – Motorized (400 Bar)
Quantity : 2
Own
Dozing Pump
Quantity : 2
Own
Dewatering Pump
Quantity : 2
Own
Dead Weight Tester
Quantity : 1
Own
Chart Recorder (Two Pen)
Quantity : 1
Own
Holiday Detector Unit
Quantity : 4
Own
Pipe Trailer
Quantity : 1
Own
Grinder Machine
Quantity : 24
Own